This is a list of electrical generating stations in Alberta, Canada.

Alberta produces a large share of its electricity through natural gas and a decreasing share of its electricity through coal (the latter were to be phased out by 2023, seven years ahead of the provincial and federal phase-out, but the last units have been delayed until 2024).[1][2] Over the last few years, a booming economy and the deregulation of the electricity market has led to the construction of dozens of new facilitiesprimarily[3] alternatives (cogeneration, waste heat recovery) and renewables (e.g. wind, solar, biomass, biogas)and the retirement of over a dozen coal-fired and older gas-fired units.[3][4]

Fossil fuel

  Facilities partially operational
  Facilities under construction
  Planned facilities
  Decommissioned facilities (year)

Coal

List of all coal power plants in Alberta.

Name Location Capacity (MW) Date Owner Ref
Genesee Generating Station units 1 & 253°20′35″N 114°18′11″W / 53.34306°N 114.30306°W / 53.34306; -114.30306 (Genesee Generating Station)8601989–1994Capital Power[5][6]
Genesee Generating Station unit 353°20′35″N 114°18′11″W / 53.34306°N 114.30306°W / 53.34306; -114.30306 (Genesee Generating Station)4662005Capital Power[7]
Battle River Generating Station units 1 & 2Forestburg(56)(1998)Heartland Generation[8]
Keephills Generating Station unit 1Duffield395(2021)TransAlta-
Keephills Generating Station unit 3Duffield466(2021)Capital Power[10]
Sundance Power Station units 4 & 553°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.55722812(2021)TransAlta[11]
H. R. Milner Generating StationGrande Cache(158)(2019)Milner Power[12]
Wabamun Generating Station Units 1–4Wabamun(570)(2003–2010)TransAlta[13]

Natural gas

List of all natural gas power plants in Alberta including cogeneration.

Name Location Capacity (MW) Date Owner Ref
Alberta Power Project – BurdettBurdett72001Maxim Power[14]
Alberta Power Project – CoaldaleCoaldale62001Maxim Power
Alberta Power Project – TaberTaber82001Maxim Power
Aurora Generating StationAurora851999Syncrude[15]
Balzac Power Station Nexen IncBalzac1202001Nexen[16]
Battle River Generating Station unit 4Forestburg1552022Heartland Generation[17]
Battle River Generating Station unit 5Forestburg3852021Heartland Generation[17]
Bear Creek Gas Turbine 1 (BCRK)Grande Prairie642002TransCanada[18]
Bellshill Power CentreGalahad5.62015Genalta Power[19]
Cadotte Power CentrePeace River202012Genalta Power[20]
Calgary Energy CentreCalgary3202002Enmax[21]
Carseland Power PlantCarseland952001TransCanada
Carson Creek Power CentreWhitecourt152014Genalta Power[22]
CascadeYellowhead County9002023Kineticor Resource Corp[23]
Cavalier Gas PlantStrathmore1202001Enmax
Clover Bar Energy Centre53°35′14″N 113°21′56″W / 53.58722°N 113.36556°W / 53.58722; -113.365562502008–2009Capital Power[24]
Cold LakeCold Lake1682002Imperial Oil
Crossfield Energy CentreRocky View1442009Enmax[25]
DrywoodDrywood62000TransAlta
Empress Cogeneration Power Facility Cypress County 45 2022 Pembina Pipeline [26]
Fort Saskatchewan Cogeneration PlantFort Saskatchewan1181999Strongwater Energy, TransAlta[27]
Foster Creek CogenerationBonnyville982003Cenovus
Genesee Power Plant Natural Gas Conversion Leduc County 1360 2024 Capital Power [28][29]
Harvest Operations Gas Fired Power Plant Flagstaff County 5.6 202x Harvest Operations Corp. [30]
Heartland Petrochemical ComplexStrathcona County1162021Inter Pipeline Ltd.[31]
H. R. Milner Generating StationGrande Cache2082020Milner Power[32]
Joffre Cogeneration PlantRed Deer4742000Capital Power Corporation, NOVA Chemicals, Heartland Generation[33]
Judy Creek Power CentreWhitecourt152014Genalta Power[34]
Kaybob South #3 Cogeneration PlantGreenview County402022TransAlta, SemCAMS[35]
Keephills Generating Station unit 2Duffield3952021TransAlta[36][37]
Keephills Generating Station unit 3Duffield4632021Capital Power[10]
MacKay River Power PlantFort McMurray2072003TransCanada
Mazeppa Gas PlantMazeppa17MFC Resource Partnership
Medicine Hat Generating StationMedicine Hat2992007–2009City of Medicine Hat
Muskeg River Mine Cogeneration Station57°18′0″N 111°30′0″W / 57.30000°N 111.50000°W / 57.30000; -111.500001722002Heartland Generation[38][39]
Northern Prairie Power ProjectGrande Prairie1052008Constellation Energy[40]
Peace River Power CentrePeace River202015Genalta Power[41][42]
Poplar Creek Cogeneration PlantFort McMurray3762001TransAlta
Poplar Hill Generating PlantGrande Prairie

55°20′20″N 119°13′07″W / 55.33889°N 119.21861°W / 55.33889; -119.21861

481999Heartland Generation[43]
Primrose Cogeneration PlantPrimrose1001998Canadian Natural resources, Heartland Generation[44]
Rainbow Lake Generating StationRainbow Lake971968–2001Heartland Generation, Husky Oil[45][46]
Redwater CogenerationRedwater922001TransCanada
Scotford Air LiquideFort Saskatchewan1062000Air Liquide Canada
Scotford Cogeneration PlantFort Saskatchewan1952003Heartland Generation[47]
Sheerness Generating StationHanna8001986–1990Heartland Generation, TransAlta[48][49]
Shepard Energy CentreCalgary8682015ENMAX, Capital Power[50]
Sturgeon Generating PlantValleyview181957–1961ATCO Power[51]
Sundance Power Station unit 453°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.557221132021TransAlta[11]
Sundance Power Station unit 653°30′27″N 114°33′26″W / 53.50750°N 114.55722°W / 53.50750; -114.557224012021TransAlta[52]
Three Creeks Power Plant Peace No. 135 100 202x Kineticor Resource Corp. [53]
University of Alberta Heating PlantUniversity of Alberta39.71994–2000University of Alberta[54]
University of Calgary Central Heating and Cooling PlantUniversity of Calgary122011University of Calgary[55][56]
Valleyview 1 and 2 Generating PlantsValleyview902001–2008Heartland Generation[57]
Clover Bar Generating Station Units 1-4Edmonton(660)(2005)Capital Power[58][59]
Medicine Hat Gas Power Units 5 & 8Medicine Hat(37)(2009)City of Medicine Hat
Rossdale Generating Station Units 8–10Edmonton(209)(2009)Capital Power

Renewable

Biomass, biogas, and waste heat recovery

List of all biomass, biogas and waste heat recovery power plants in Alberta.

Name Location Capacity (MW) Date Owner Type Ref
Alberta Pacific Forest (AFG1)Athabasca1311993–2012Alberta Pacific ForestBiomass[60]
Bonnybrook (BON1) Calgary 10 2021 City of Calgary Biomass [61][62]
Bear Creek 2 (BCR2)Grande Prairie362002TransCanadaBiomass+Waste Heat[63]
Cancarb Waste Heat Recovery Plant (CCMH)Medicine Hat422000Tokai Carbon Co. Ltd.Waste heat[64]
Clover Bar Landfill GasEdmonton52005Capital PowerBiogas[65]
DAI1 Daishowa (DAI1)

Peace River Pulp Mill

Peace River521990–2012Daishowa-Marubeni InternationalBiomass[66]
Gold Creek Generation Facility (GOC1)54°49′59″N 118°39′10″W / 54.83306°N 118.65278°W / 54.83306; -118.6527851999Maxim PowerWaste heat[67]
Grande Prairie EcoPower (GPEC) Grande Prairie 18 2005 Canadian Forest Products Ltd. Biomass [68]
NRGreen (NRG3) Whitecourt 16 2015 NRGreen Power Limited Partnership Waste Heat [69]
Slave Lake (SLP1) Slave Lake 9 2016 West Fraser Mills Ltd. Biomass [70][71]
Weldwood #1 (WWD1)

Hinton Pulp Units 1 & 2

Hinton501985–2011West Fraser TimberBiomass[72]
Westlock (WST1)

Dapp Biomass Project

Dapp161999FortistarBiomass[73][74]
Weyerhaeuser (WEY1)

Grande Prairie Pulp Mill

Grande Prairie482011International Paper Canada Pulp HoldingsBiomass
Whitecourt Power (EAGL)Whitecourt251994Macquarie Power & InfrastructureBiomass[75]
Judy Creek ORCSwan Hills2.22012Genalta PowerWaste Heat[76]
Valley PowerDrayton Valley121996Algonquin PowerBiomass[77]
Wheatland BioFuel FacilityWheatland County12022Carbon Clean Energy Inc.Biogas[78]
East Calgary Landfill Gas to Electricity FacilityCalgary12023City of CalgaryBiogas[79]

Geothermal

List of all geothermal power stations in Alberta. More than 388,500 MW of geothermal generation potential remains untapped, which is approximately 24 times Alberta's total installed generating capacity in 2019.[80]

Name Location Capacity (MW) Date Owner Ref
Greenview Geothermal Power Plant (Alberta No. 1) Municipal District of Greenview No. 16 5 2023 Terrapin Geothermics [81]

Hydroelectric

List of all hydroelectric power stations power plants in Alberta. More than 11,500 MW of hydroelectric potential remains untapped.[82]

Name Location Capacity (MW) Date Owner Ref
Amisk Hydroelectric Project Dunvegan 370 202x[note 1] Concord Green Energy [83][84]
Barrier Hydroelectric Dam51°02′03.4″N 115°02′27.5″W / 51.034278°N 115.040972°W / 51.034278; -115.040972 (Barrier Dam)131947TransAlta[85]
Bearspaw Hydroelectric Dam51°06′03.5″N 114°16′57.6″W / 51.100972°N 114.282667°W / 51.100972; -114.282667 (Bearspaw Dam)171954TransAlta[86]
Belly River Hydroelectric DamGlenwood31991TransAlta[87]
Bighorn Dam52°18′32″N 116°19′45″W / 52.30889°N 116.32917°W / 52.30889; -116.32917 (Bighorn Dam)1201972TransAlta[88]
Brazeau Hydroelectric Dam52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W / 52.96639; -115.57889 (Brazeau)3551965TransAlta[89]
Cascade Hydroelectric51°12′00.9″N 115°30′07.7″W / 51.200250°N 115.502139°W / 51.200250; -115.502139 (Cascade)361942TransAlta[90]
Chin Reservoir StationChin11.41994Irrican Power[91]
Dickson Dam52°03′06″N 114°13′07″W / 52.05167°N 114.21861°W / 52.05167; -114.21861 (Dickson Dam)151992Algonquin Power[92]
Drop 4, 5, and 6 Hydroelectric PlantRaymond6.92004Irrican Power
Ghost Hydroelectric Dam51°13′07.2″N 114°42′26.9″W / 51.218667°N 114.707472°W / 51.218667; -114.707472 (Ghost Dam)511929TransAlta[93]
Horseshoe Hydroelectric Dam51°07′03.5″N 115°02′07″W / 51.117639°N 115.03528°W / 51.117639; -115.03528 (Horseshoe Dam)141911TransAlta[94]
Interlakes Hydroelectric Dam50°38′00.4″N 115°08′21.1″W / 50.633444°N 115.139194°W / 50.633444; -115.139194 (Interlakes Dam)51955TransAlta[95]
Kananaskis Hydroelectric Dam51°05′49.4″N 115°03′29.8″W / 51.097056°N 115.058278°W / 51.097056; -115.058278 (Kananaskis Dam)191913TransAlta[96]
Oldman River Hydroelectric PlantPincher Creek322003ATCO Power[97]
Pocaterra Hydroelectric DamKananaskis151955TransAlta[98]
Raymond Reservoir Generating StationRaymond20.51994Irrican Power
Rundle Hydroelectric Dam51°05′19.3″N 115°22′23.9″W / 51.088694°N 115.373306°W / 51.088694; -115.373306 (Rundle Dam)501951TransAlta[99]
Spray Hydroelectric Dam51°04′28.1″N 115°24′07.8″W / 51.074472°N 115.402167°W / 51.074472; -115.402167 (Spray Dam)1031951TransAlta[100]
St. Mary Hydroelectric DamMagrath21992TransAlta[101]
Taylor Hydroelectric DamMagrath132000TransAlta[102]
Three Sisters Hydroelectric Dam50°59′54.7″N 115°22′30.0″W / 50.998528°N 115.375000°W / 50.998528; -115.375000 (Three Sisters Dam)31951TransAlta[103]
Waterton Hydroelectric DamGlenwood31992TransAlta[104]

Wind

List of all wind farms power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Ardenville Wind Farm (ARD1)Fort Macleod662010TransAlta[3][105]
Blackspring Ridge (BSR1)Vulcan County3002014EDF Renewables, Enbridge[106][107]
Blue Trail (BTR1)Fort Macleod662009TransAlta[108]
Bull Creek (BUL1 and BUL2)Provost292015BluEarth Renewables[109]
Castle River (CR1)Pincher Creek442000–2001TransAlta[110]
Castle Rock Wind Farm (CRR1)Drumheller772012Enel[3]
Castle Rock Ridge 2 (CRR2)Pincher Creek292020Enel Green Power[111]
Chin Chute (SCR3)Taber302006Acciona, Enbridge, Suncor Energy[112][113]
Cowley Ridge (CRE3)Cowley202001TransAlta[114]
Cypress 1 (CYP1)

Cypress Wind Power Project

Forty Mile1962023EDF Renewables[115][116]
Cypress 2 (CYP2) Forty Mile 46 2023 EDF Renewables [115][116]
Forty Mile Granlea (FMG1)Forty Mile202.52022ATCO[117]
Garden Plain (GDP1)

Garden Plain

County of Paintearth No. 181302023TransAlta[118]
Ghost Pine Wind Energy Centre (NEP1)Drumheller822010NextEra[119]
Grizzly Bear Creek (GRZ1)

Grizzly Bear Wind Power Project

Minburn County No. 271522023Enel Green Power[120]
Halkirk (HAL1)Halkirk1502012Capital Power[121]
Hand Hills (HHW1)

Hand Hills

Starland County1452023BluEarth Renewables[122]
Hilda Wind (HLD1)

Hilda Wind

Cypress County1002023RES Canada[123]
Kettles Hill (KHW1)Pincher Creek632006–2007Enmax[124]
Lanfine Wind (LAN1) Special Area No. 3 151.2 Q1 2023 Pattern Energy [125][126]
Macleod FlatsFort Macleod32004TransAlta[127]
Magrath (SCR2)Magrath302004Acciona, Enbridge, Suncor Energy[112][113]
McBride Lake (AKE1)Fort Macleod752003Enmax, TransAlta[128][129]
Oldman River Wind ProjectPincher Creek3.62007Alberta Wind Energy Corporation[130]
Oldman 2 (OWF1)Pincher Creek462014Mainstream Renewable Power[131]
Rattlesnake Ridge (RTL1)Whitla1302022Berkshire Hathaway Energy Canada[132]
Riverview (RIV1)Pincher Creek1052020Enel Green Power[133]
SinnottCowley72001TransAlta[134]
Soderglen (GWW1)Fort Macleod70.52006Nexen, TransAlta[135]
Summerview 1 (IEW1)Pincher Creek702004TransAlta[136]
Summerview 2 (IEW2)Pincher Creek662010TransAlta[137]
Taber Wind Farm (TAB1)Taber802007Enmax[138]
Whitla Wind 1 (WHT1)Forty Mile2022019Capital Power[139]
Whitla Wind 2 (WHT2)Forty Mile1512021Capital Power[140]
Windrise (WRW1)Fort Macleod206.42021TransAlta[141]
Wheatland (WHE1)Wheatland County122.42022Greengate Power Corporation[142]
Wintering Hills Wind Farm (SCR4)Drumheller882011Suncor[143]
Jenner 1 (JNR1)

Jenner Wind Project (Phase 1)

Special Area No. 2 122 Q3 2023 Potentia Renewables Inc. [144][145]
Jenner 3 (JNR3)

Jenner Wind Project (Phase 3)

Special Area No. 2109Q3 2023Potentia Renewables Inc.[144][146]
Stirling Wind Phase 1 (SWP1) Warner County No. 5 113 Q4 2023 Greengate Power Corporation [147][148]
Sharp Hills (SHH1)Special Area 3297.1Q3 2023EDP Renewables[149][150]
Jenner 2 (JNR2)

Jenner Wind Project (Phase 2)

Special Area No. 2 71 Q4 2023 Potentia Renewables Inc. [144][151]
Paintearth Wind Project (PAW1)Special Area No. 18198Q4 2023Potentia Renewables Inc.[152]
Buffalo Atlee (BFL1) Special Area No. 2 18 Q4 2023 Capstone Infrastructure [153]
Buffalo Atlee (BFL2) Special Area No. 2 18 Q4 2023 Capstone Infrastructure [153]
Buffalo Atlee (BFL3) Special Area No. 2 18 Q4 2023 Capstone Infrastructure [153]
Buffalo Atlee (BFL4)Special Area No. 218Q4 2023Capstone Infrastructure[153]
Forty Mile Granlea Phase 2 Forty Mile 220 Q2 2024 ATCO [154]
Winnifred Wind ProjectForty Mile122.3Q3 2024Enerfin Energy[155]
Buffalo Plains Wind FarmLomond494Q4 2024Copenhagen Infrastructure Partners[156]
Forty Mile Wind Project Phase 1Forty Mile279.3Q4 2024ACCIONA Energía[157][158]
Halkirk Wind Project Phase 2Paintearth County No. 18140Q4 2024CapitalPower[159][160]
Wild Rose 2Cypress County1922024Capstone Infrastructure[161]
Tempest Wind Power ProjectFlagstaff County992024TransAlta Renewables[162][163]
Forty Mile Wind Project Phase 2Forty Mile119.7Q3 2025RES[157]
Northern Valley Wind Project Two Hills County No. 21 75 2024 Elemental Energy [164][165]
Pihew Wacity Wind ProjectSt. Paul County No. 191302025Northland Power[166]
Bull Trail WindCypress County2702026EDF Renewables[167]

Solar

List of all solar power stations in Alberta.

Name Location Capacity (MW) Date Owner Ref
Barlow Solar (BLS1)

Barlow Solar Park

Calgary272023DP Energy[168]
Brooks Solar (BSC1)Brooks152017Elemental Energy[169]
Brooks Solar 1 (BRK1)

Brooks Solar II Project

Brooks132022Elemental Energy[170]
Brooks Solar 2 (BRK2)

Brooks Solar II Project

Brooks 14 2022 Elemental Energy [170]
Burdett (BRD1)

Alberta Solar One Project

Burdett10.52021Enbridge, Morgan Solar Inc[171][172]
Burdett Solar (BUR1)Burdett202021BluEarth Renewables[173]
Chappice Lake (CHP1)

Chappice Lake Solar Storage Project

Cypress County142023Elemental Energy[174][175]
Claresholm 1 (CLR1)

Claresholm Solar Project

Claresholm582021Capstone Infrastructure[176][177]
Claresholm 2 (CLR2)

Claresholm Solar Project

Claresholm 75 2021 Capstone Infrastructure [176][177]
Clydesdale 1 (CLY1)

Clydesdale Solar Project

Municipal District of Taber412022Capital Power[178]
Clydesdale 2 (CLY2)

Clydesdale Solar Project

Municipal District of Taber 34 2022 Capital Power [178]
Coaldale (COL1)

Coaldale Solar Project

Lethbridge County232022ACFN, Concord Coaldale Partnership[179][180]
Conrad 1 (CRD1)

Wrentham Solar Project

Wrentham232023Solar Krafte[181]
Conrad 2 (CRD2)

Wrentham Solar Project

Wrentham 18 2023 Solar Krafte [181]
East Strathmore Namaka (NMK1)

East Strathmore Solar Project

Wheatland County20.52022Elemental Energy[182]
Fox Coulee (FCS1) Starland County 75 2023 Subra LP [183]
Hays (HYS1)

Canadian Solar Solutions Project

Hays232021BluEarth Renewables [184][185]
Hull (HUL1)

Prairie Sunlight II Project

Vauxhall 25 2020 Solar Krafte Utilities [186]
Innisfail (INF1)

Innisfail Solar

Innisfail222020Elemental Energy[187]
Jenner (JER1)

Canadian Solar Solutions Project

Jenner232021BluEarth Renewables[188][189]
kisikaw-pisim 1 (KKP1)

kīsikāw pīsim Project

Edmonton72022Epcor[190][191]
kisikaw-pisim 2 (KKP2)

kīsikāw pīsim Project

Edmonton 7 2022 Epcor [190][191]
Kneehill Solar (TRH1)

Kneehill Solar Generation Facility

Kneehill County252023Capstone Infrastructure [192]
Michichi Solar (MIC1)

Michichi Solar Generation Facility

Starland County 25 2023 Capstone Infrastructure [193]
Monarch (MON1)

Monarch Solar

Lethbridge County242022Concord Coaldale Partnership[194]
Strathmore 1 (STR1)

Strathmore Solar

Strathmore182022Capital Power[195]
Strathmore 2 (STR2)

Strathmore Solar

Strathmore 23 2022 Capital Power [195]
Suffield (SUF1)

Suffield Solar

Suffield232020Suffield Solar GP Inc.[196]
Vauxhall (VXH1)

Prairie Sunlight III Project

Taber222020Solar Krafte Utilities[197]
Three Nations Energy Solar FarmFort Chipewyan[note 2]2.22020Three Nations Energy (joint venture)[198]
Travers (TVS1)

Travers Solar Project

Vulcan County4652022Greengate Power[199]
Westfield Yellow Lake (WEF1)

Yellow Lake Solar

Forty Mile192021BluEarth Renewables[200]
Deerfoot Solar Park (DFT1)Calgary37Q3 2023DP Energy[201][202]
Empress Solar Park (EMP1) Empress 39 Q3 2023 Achernar GP Ltd [203]
Michichi Creek (MCH1)

Drumheller Solar and Battery Storage Project

Drumheller 14 Q3 2023 Concord Green Energy [204][205]
Stavely (STV1) Stavely 17 Q3 2023 Concord Stavely Partnership [206]
Fox Coulée Solar Project (FCS1)Starland County75Q4 2023Neoen[207]
Joffre Solar 1 (JFS1)Joffre25Q4 2023PACE Canada LP[208][209]
Joffre Solar 2 (JFS2) Joffre 22 Q4 2023 PACE Canada LP [208][210]
Saddlebrook Solar Project (SDL1)Foothills County81Q4 2023TC Energy Corporation[211]
Sollair Solar Energy Plant (SCR1) Airdrie 75 Q4 2023 General Land and Power [212][213]
Spring Coulee Solar (SGC1)Spring Coulee30Q4 2023Solar Krafte[214]
Wheatcrest Solar Project (WCR1)Taber50Q4 2023BluEarth Renewables[215]
Youngstown Solar (YNG1)Youngstown6Q4 2023PACE Canada LP[216][217]
Brooks Solar FarmBrooks360Q4 2023Solar Krafte[218][219]
Scottford Refinery Solar FarmStrathcona County58Q4 2023Silicon Ranch[220]
Métis Crossing Solar Farm ProjectSmokey Lake County4.86Q1 2024Métis Nation of Alberta[221][222]
Caroline SolarCaroline14Q2 2024PACE Canada LP[223][224]
Jurassic Solar +Special Area No. 2220Q2 2024Greengate[225]
Tilley SolarTilley24Q2 2024Acestes Power[226]
Vulcan Community Solar Project Vulcan 15 Q2 2024 Fortis Alberta [227]
Big Sky Solar Acadia No. 34 140 Q4 2024 RES [228][229]
Enterprise SolarVulcan65Q4 2024Pattern Energy [230][231]
Georgetown Solar ProjectVulcan County278Q1 2025MYTILINEOS Energy & Metals[232]
Dunmore Solar ProjectCypress County216Q2 2025Ascent Energy Partners[233][234]
Lathom Solar ProjectLathom120Q3 2023Greengate Power[235]
Moon Lake Solar ProjectParkland County24.9Q3 2023Voltarix Group[236]
Vauxhall SolarTaber60Q3 2023Solar Krafte[237]
Vulcan SolarVulcan County772023EDF Renewable Energy[238]
Rocktree Solar ProjectParkland County22.6Q3 2023Voltarix Group[239]
Hanna Sheerness SolarHanna13Q4 2023PACE Canada LP[240]
Creekside Solar ProjectLeduc County24.9Q4 2023Voltarix Group[241]
Foothills Solar ProjectFoothills County150Q4 2023Elemental Energy[242]
High River SolarFoothills County19Q4 2023Elemental Energy[243]
Luna Solar+ Phase INewell County465Q2 2024Greengate[244]
Nova Solar Project Carseland 150 Q3 2024 Renewable Energy Systems [245]
Dolcy Solar Project Edgerton 200 2024 Westbridge Energy [246]
Saamis SolarMedicine Hat3252024DP Energy[247]
Sylvan Solar Farm Sylvan Lake 170 2024 Kiwetinohk Energy [248]
Aira Solar Project Bow Island 450 Q1 2025 Aria [249]
Luna Solar+ Phase IINewell County465Q2 2025Greengate[250]
Estuary Solar Project Cypress County 200 Q4 2025 Greencells IndyGen Alberta Ltd [251][252]
Airport City SolarLeduc120202xAlpin Sun[253]

Storage

Battery

List of all lithium-ion battery storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
eReserve1 Rycroft (ERV1)Spirit River20352020Teric Power Ltd[254]
eReserve2 Buffalo Creek (ERV2)Wainwright20352021Teric Power Ltd[255]
eReserve3 Mercer Hill (ERV3)Grande Prairie20352022Teric Power Ltd[256]
eReserve4 (ERV4) Hardisty 20 35 2023 TERIC Power Ltd [257]
eReserve5 Hughenden (ERV5) Hughenden 20 35 January 16, 2023 TERIC Power Ltd [258]
eReserve6 (ERV6) Hardisty 20 35 2023 TERIC Power Ltd [257]
eReserve7 (ERV7) Wapiti 20 20 2023 [259]
eReserve8 (ERV8) Wapiti 20 20 2023 [260]
eReserve9 (ERV9) Hythe 20 20 2023 [261]
Summerview (SUM1)

WindCharger

Pincher Creek10202020TransAlta[262]
WaterCharger Battery StorageCochrane1803602023TransAlta[263]

Pumped hydroelectric

List of all pumped hydroelectric storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Canyon CreekYellowhead County75–400[note 3]~2775202xTurning Point Generation, TC Energy[264][265]
Brazeau Hydro Pumped Storage[note 4] 52°57′59″N 115°34′44″W / 52.96639°N 115.57889°W / 52.96639; -115.57889 (Brazeau) 900 5,000 2025–2026 TransAlta [266][267]

Geomechanical pumped

List of all geomechanical pumped storage plants in Alberta.

Name Location Power Capacity (MW) Energy Capacity (MWh) Date Owner Ref
Brooks 202x Quidnet [268]

See also

Notes

  1. Stalled As of June 2020 yet still on track; see row references for more information (official update).
  2. Off-grid.
  3. Initially 75 MW; expandable to 400 MW.
  4. Pump-back expansion of existing hydroelectric dam site.

References

  1. Healing, Dan (2020-12-04). "Alberta set to retire coal power by 2023, ahead of 2030 provincial deadline". Global News. Retrieved 2020-12-09.
  2. "Genesee Generating Station Repowering Genesee 1 & 2". Capital Power. Retrieved 21 August 2023.
  3. 1 2 3 4 Government of Alberta, "Electricity Statistics", Alberta Energy, archived from the original on 2010-08-26, retrieved 2010-08-27
  4. Seskus, Tony (2020-09-21). "How Alberta — yes, Alberta — could lead Canada in wind and solar by 2025". CBC News. Retrieved 2021-03-06.
  5. CapitalPower, Genesee 1 and 2, retrieved 2021-08-01
  6. "Notice re. Status of Genesee Re-Powering Project and Genesee Units 1 (GN1) and 2 (GN2)". AESO. Retrieved 2023-06-29.
  7. CapitalPower, Genesee 3, retrieved 2021-08-01
  8. ATCO Power, Battle River Coal-Fired Generating Station, archived from the original on 2010-07-27, retrieved 2010-08-27
  9. TransAlta, Keephills 1, retrieved 2022-01-01
  10. 1 2 TransAlta, Keephills 3, retrieved 2022-01-01
  11. 1 2 "Sundance". TransAlta Power. Retrieved 2022-01-01.
  12. Alberta Energy Regulator, Coal Demand, retrieved 2020-10-07
  13. TransAlta (2010-04-01), TransAlta fully retires all units of its Wabamun power-plant, retrieved 2010-09-06
  14. Maxim Power Corp., Alberta Power Project (APP), retrieved 2010-08-27
  15. "CCGT Plants in Canada - Alberta", Power Plants Around the World, retrieved 2010-08-22
  16. Jones, Jeffrey (2009-06-23), "Nexen may sell gas, power marketing businesses", Reuters, retrieved 2010-08-27
  17. 1 2 Heartland Generation, Battle River Generating Station, retrieved 2022-06-02
  18. TransCanada, Assets, retrieved 2010-08-27
  19. Alberta Utilities Commission, Genalta Construction GP Ltd. - AUC.ab.ca (PDF), retrieved 2015-03-08
  20. The Alberta Utilities Commission (2013-05-02), Decision 2013-165 – Genalta Power Systems Inc.; 15 MW natural gas-fired power plant (PDF), retrieved 2015-03-06
  21. Enmax, Calgary Energy Centre, archived from the original on 2011-07-10, retrieved 2010-08-22
  22. The Alberta Utilities Commission (2014-06-19), DA2014-145 – Transfer of Ownership of a 15-MW Gas-Fired Turbine Power Plant (PDF), retrieved 2015-03-05
  23. Kineticor, Cascade Power Project, retrieved 2020-09-07
  24. Capital Power Corporation, Clover Bar Energy Centre, archived from the original on 2010-09-04, retrieved 2010-08-22
  25. Enmax, Crossfield Energy Centre, retrieved 2010-08-22
  26. "Empress Cogeneration Power Facility". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  27. TransAlta, Plants in Operation, retrieved 2012-02-28
  28. "Genesee Power Plant Natural Gas Conversion". Alberta Major Projects. Government of Alberta. Retrieved 2021-07-10.
  29. Capital Power, Genesee Generating Station, retrieved 2021-07-10
  30. "Harvest Operations Gas Fired Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  31. Heartland Petrochemical Complex, retrieved 2021-12-05
  32. Milner Power, H. R. Milner Generating Station, retrieved 2021-08-01
  33. ATCO Power, Joffre Cogeneration Plant, archived from the original on 2010-07-27, retrieved 2010-08-21
  34. The Alberta Utilities Commission (2014-06-20), DA2014-146 – Transfer of Ownership of 15-MW Gas-fired Power Plant (PDF), retrieved 2015-03-05
  35. TransAlta, SemCAMS Cogeneration Project, retrieved 2020-09-07
  36. AESO, Keephills Generating Station 2, retrieved 2021-08-01
  37. TransAlta, Keephills Generating Station 2, retrieved 2021-08-01
  38. ATCO Power, Muskeg River Cogeneration Plant, retrieved 2010-08-27
  39. SaskPower, Cogeneration Stations, retrieved 2010-10-09
  40. Constellation Energy, Northern Prairie Power Project – Project Description (PDF), retrieved 2010-08-27
  41. Genaltapower, Genalta Power and Baytex Energy announce activation of first phase in 20MW gas conservation power project, retrieved 2015-03-05
  42. Genalta Power
  43. ATCO Power, Poplar Hill Generating Plant, archived from the original on 2009-02-07, retrieved 2010-08-21
  44. ATCO Power, Primerose Cogeneration Plant, retrieved 2010-08-21
  45. ATCO Power, Rainbow Lake Generating Station 1, 2 and 3, retrieved 2010-08-21
  46. ATCO Power, Rainbow Lake Generating Station 4 and 5, retrieved 2010-08-21
  47. ATCO Power, Scotford Cogeneration Plant, retrieved 2010-08-21
  48. AESO, Sheerness Generating Station, retrieved 2021-08-01
  49. gem.wiki, Sheerness Generating Station, retrieved 2021-08-01
  50. ENMAX, Shepard Energy Centre, retrieved 2015-09-16
  51. ATCO Power, Sturgeon Generating Plant, retrieved 2010-08-21
  52. "Sundance Coal to Gas". TransAlta Power. Retrieved 2021-02-25.
  53. "Three Creeks Power Plant". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  54. University of Alberta, Heating Plant, retrieved 2011-09-26
  55. University of Calgary, Central Heating and Cooling Plant, retrieved 2019-05-24
  56. University of Calgary, New U of C power plant will slash emissions, retrieved 2019-05-24
  57. ATCO Power, Valleyview 1 and 2 Generating Plants, retrieved 2010-08-21
  58. "Gas- and Oil-Fired Plants in Canada", Power Plants Around the World, archived from the original on 2009-07-19, retrieved 2010-08-22
  59. Capital Power Corporation (2005-07-28), EPCOR to Decommission Clover Bar Generating Station, retrieved 2010-08-27
  60. Alberta Pacific Forest, Chemical Recovery & Utilities, retrieved 2010-08-27
  61. Alberta, Government of. "Bonnybrook WWTP Cogeneration Expansion". majorprojects.alberta.ca. Retrieved 2023-11-17.
  62. Services, Water Resources and Water. "Bonnybrook Wastewater Treatment Plant Upgrades and Expansion". www.calgary.ca. Retrieved 2023-11-17.
  63. "TC Energy — Bear Creek Cogeneration Plant". www.tcenergy.com. Retrieved 2023-10-29.
  64. "Cancarb Sold: Medicine Hat Facility Purchased By Japanese Firm For $190 Million". HuffPost Canada. Retrieved 2017-07-07.
  65. Capital Power Corporation, Clover Bar Landfill Gas, retrieved 2010-08-27
  66. Daishowa-Marubeni International Ltd, Green Power Enhancement Project, retrieved 2012-10-16
  67. Maxim Power Corp., Gold Creek, Alberta, retrieved 2010-08-27
  68. "Energy - Pellets and Energy Generation | Canfor". www.canfor.com. Retrieved 2023-11-17.
  69. "Whitecourt Energy Efficiency Project". Emissions Reduction Alberta. Retrieved 2023-12-27.
  70. "Energy Initiatives - West Fraser".
  71. Snook, Andrew (2016-03-31). "Slave Lake creates green power from biogas". Canadian Biomass Magazine. Retrieved 2023-12-27.
  72. DNatural Resources Canada, Government of Canada Investing in Environmental Improvements at Hinton Pulp Mill, retrieved 2012-10-16
  73. Verdant Energy, Dapp Biomass Project, retrieved 2010-08-27
  74. Hager, Heather (2011-10-31). "Power to the People at Dapp". Canadian Biomass Magazine. Retrieved 2023-12-27.
  75. Macquarie Power & Infrastructure Income Fund, Whitecourt, retrieved 2010-08-22
  76. Genaltapower, Genalta Power Aggravated heat recovery, retrieved 2015-03-06
  77. Algonquin Power, Valley Power, retrieved 2010-08-22
  78. Alberta Major Projects, Project Wheatland BioFuel Facility, retrieved 2021-12-10
  79. Alberta Major Projects, East Calgary Landfill Gas to Electricity Facility, retrieved 2021-12-10
  80. Duncanson, Sander; Kennedy, Jessica; Baker, Jesse (2020-11-02). "Alberta government introduces Bill 36: The Geothermal Resource Development Act". Osler, Hoskin & Harcourt. Retrieved 2021-02-06.
  81. "Greenview Geothermal Power Plant (Alberta No. 1)". Alberta Major Projects. Retrieved 2021-01-12.
  82. "Hydroelectricity in Alberta Today - Electricity & Alternative Energy - Alberta's Energy Heritage". www.history.alberta.ca. Retrieved 2021-02-06.
  83. "Home". AMISK Hydroelectric Project. Retrieved 2021-01-02.
  84. Berrade, David (2020-06-09). "Amisk Hydroelectric Project Update" (PDF).
  85. TransAlta, Barrier Hydroelectric Dam, retrieved 2021-08-01
  86. TransAlta, Bearspaw Hydroelectric Dam, retrieved 2021-08-01
  87. TransAlta, Belly River Hydroelectric Dam, retrieved 2021-08-01
  88. TransAlta, Bighorn Dam, retrieved 2021-08-01
  89. TransAlta, Brazeau Hydroelectric Dam, retrieved 2021-08-01
  90. TransAlta, Cascade Hydroelectric Dam, retrieved 2021-08-01
  91. "IRRICAN POWER GENERAL OVERVIEW" (PDF). St. Mary River Irrigation District. Archived from the original (PDF) on 2012-03-11. Retrieved 2010-08-27.
  92. Algonquin Power, Dickson Dam, retrieved 2010-08-25
  93. TransAlta, Ghost Hydroelectric Dam, retrieved 2021-08-01
  94. TransAlta, Horseshoe Hydroelectric Dam, retrieved 2021-08-01
  95. TransAlta, Interlakes Hydroelectric Dam, retrieved 2021-08-01
  96. TransAlta, Kananaskis Hydroelectric Dam, retrieved 2021-08-01
  97. ATCO Power, Oldman River Hydroelectric Plant, retrieved 2010-08-25
  98. TransAlta, Pocaterra Hydroelectric Dam, retrieved 2021-08-01
  99. TransAlta, Rundle Hydroelectric Dam, retrieved 2021-08-01
  100. TransAlta, Spray Hydroelectric Dam, retrieved 2021-08-01
  101. TransAlta, St. Mary Hydroelectric Dam, retrieved 2021-08-01
  102. TransAlta, Taylor Hydroelectric Dam, retrieved 2021-08-01
  103. TransAlta, Three Sisters Hydroelectric Dam, retrieved 2021-08-01
  104. TransAlta, Waterton Hydroelectric Dam, retrieved 2021-08-01
  105. TransAlta, Ardenville, retrieved 2012-10-02
  106. EDF Renewables, Blackspring Ridge Wind, retrieved 2020-09-06
  107. Enbridge, Blackspring Ridge, retrieved 2020-09-06
  108. TransAlta, Blue Trail, retrieved 2010-08-23
  109. BluEarth Renewables, Bull Creek Wind, retrieved 2020-09-06
  110. TransAlta, Castle River, retrieved 2010-08-22
  111. Enel Green Power, Castle Rock Ridge 2, retrieved 2020-09-06
  112. 1 2 Acciona Energía, Own facilities, archived from the original on 2009-01-14, retrieved 2010-08-22
  113. 1 2 Suncor Energy, Wind Energy, retrieved 2010-08-22
  114. TransAlta, Cowley North, retrieved 2010-08-22
  115. 1 2 EDF Renewables, Cypress Wind Power Project, retrieved 2021-05-08
  116. 1 2 Alberta, Government of. "Cypress Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  117. Suncor Energy, Forty Mile Wind Power Project, retrieved 2021-12-10
  118. TransAlta, Garden Plain Wind Projet, retrieved 2023-07-04
  119. NextEra Energy, Ghost Pine Wind Energy Centre Fact Sheet (PDF), retrieved 2012-10-02
  120. Grizzly Bear Wind Power Project, Grizzly Bear Wind Power Project, retrieved 2021-07-05
  121. Capital Power, Halkirk Wind Project, retrieved 2012-10-04
  122. BluEarth Renewables, Hand Hills Wind Project, retrieved 2021-12-10
  123. RES Canada, Hilda Wind, retrieved 2021-12-10
  124. Enmax, Kettle Hills Wind Farm, retrieved 2010-08-22
  125. Lanfine Wind Power Project, Lanfine Wind Power Project, retrieved 2023-01-20
  126. Alberta, Government of. "Lanfine North Wind Power Project". majorprojects.alberta.ca. Retrieved 2023-04-15.
  127. TransAlta, Macleod Flats, retrieved 2010-08-22
  128. TransAlta, McBride Lake, retrieved 2010-08-22
  129. Enmax, McBride Lake Wind Farm, archived from the original on 2010-07-13, retrieved 2010-08-22
  130. Alberta Wind Energy Corporation, Projects, archived from the original on 2010-04-21, retrieved 2010-08-23
  131. Mainstream RP, Oldman Wind Plant, retrieved 2010-08-22
  132. Berkshire Hathaway Energy Canada, Rattlesnake Ridge Wind Project, retrieved 2022-02-27
  133. Enel Green Power, Riverview, retrieved 2010-08-22
  134. TransAlta, Sinnott, retrieved 2010-08-22
  135. TransAlta, Soderglen, retrieved 2010-08-22
  136. TransAlta, Summerview, retrieved 2010-08-22
  137. TransAlta, Summerview 2, retrieved 2010-08-22
  138. Enmax, Taber Wind Farm, retrieved 2010-08-22
  139. Capital Power, Whitla Wind, retrieved 2020-09-06
  140. Capital Power, Whitla Wind 2, retrieved 2020-09-07
  141. TransAlta, Windrise, retrieved 2020-11-29
  142. Greengate Power Corporation, Wheatland Wind Project, retrieved 2020-09-07
  143. Suncor Energy, Wind Power, retrieved 2012-10-02
  144. 1 2 3 Jenner Wind Project, Jenner Wind Project (Phase 1-3), retrieved 2021-06-05
  145. "New Asset Jenner (JNR1) Notice". AESO. Retrieved 2023-10-29.
  146. "New Asset Jenner (JNR3) Notice". AESO. Retrieved 2023-10-29.
  147. Stirling Wind, Stirling-Wind, retrieved 2023-07-04
  148. "New Asset Stirling Wind (SWP1) Notice". AESO. Retrieved 2023-07-21.
  149. EDP Renewables, Sharp Hills Wind Farm, retrieved 2021-08-20
  150. "New Asset Sharp Hill Wind (SHH1) Notice". AESO. Retrieved 2023-08-30.
  151. "New Asset Jenner (JNR2) Notice". AESO. Retrieved 2023-08-30.
  152. Paintearth Wind Project, Paintearth Wind Project, retrieved 2023-01-20
  153. 1 2 3 4 Buffalo Atlee, Buffalo Atlee (Phase 1-4), retrieved 2021-06-05
  154. Alberta, Government of. "Forty Mile Wind Farm (Granlea Phase 2)". majorprojects.alberta.ca. Retrieved 2023-12-03.
  155. Enerfin Energy, Winnifred Wind Project, retrieved 2022-07-12
  156. "Buffalo Plains Wind Farm". Retrieved 2023-01-20.
  157. 1 2 "Forty Mile Wind Project Phase 1". RES. Retrieved 2023-01-20.
  158. Alberta, Government of. "Forty Mile Wind Project (ACCIONA Energía)". majorprojects.alberta.ca. Retrieved 2023-12-03.
  159. CapitalPower, Halkirk Wind Project Phase 2, retrieved 2021-12-10
  160. Alberta, Government of. "Halkirk Wind Project Phase 2". majorprojects.alberta.ca. Retrieved 2023-12-03.
  161. Capstone Infrastructure, Wild Rose 2 Wind Power Project, retrieved 2022-07-12
  162. Major Projects Alberta, Tempest Wind Power Project, retrieved 2021-06-05
  163. "Tempest". TransAlta. Retrieved 2023-06-15.
  164. Alberta, Government of. "Northern Valley Wind Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  165. "Northern Valley Wind". Elemental Energy. Retrieved 2023-12-03.
  166. Major Projects Alberta, Pihew Waciy Wind Project, retrieved 2023-01-20
  167. EDF Renewables, Bull Trail Wind, retrieved 2020-11-29
  168. DP Energy, Barlow Solar Park, retrieved 2020-09-07
  169. Elemental Energy, Brooks Solar, retrieved 2020-09-01
  170. 1 2 Elemental Energy, Brooks Solar II, retrieved 2020-09-07
  171. Enbridge, Alberta Solar One Project, retrieved 2021-02-25
  172. Morgan Solar Inc, Alberta Solar One, retrieved 2021-02-25
  173. BluEarth Renewables, Burdett Solar Project, retrieved 2020-09-01
  174. "Chappice Lake Solar Storage Project". Elemental Energy. Retrieved 2021-12-10.
  175. "New Asset Chappice Lake (CHP1) Notice". AESO. Retrieved 2023-04-24.
  176. 1 2 AESO, New Assets Claresholm (CLR1 and CLR2) Notice, retrieved 2021-01-26
  177. 1 2 Capstone Infrastructure, Claresholm, retrieved 2021-02-25
  178. 1 2 "Clydesdale Solar". Clydesdale Solar. Retrieved 2023-01-25.
  179. AESO, Coaldale Solar, retrieved 2022-04-18
  180. Kiehlbauch, Pat. "ACFN Green Energy LP". Greenplanet Energy Analytics. Retrieved 2023-04-15.
  181. 1 2 Solar Krafte, Wrentham Solar Project, retrieved 2020-09-07
  182. Elemental Energy, East Strathmore Solar Project, retrieved 2022-06-02
  183. "New Asset Fox Coulee Solar (FCS1) Notice". AESO. Retrieved 2023-10-13.
  184. Canadian Solar, Hays Solar Project, retrieved 2020-11-29
  185. "Hays Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  186. Solar Krafte Utilities, Prairie Sunlight II, retrieved 2020-09-01
  187. Elemental Energy, Innisfail Solar, retrieved 2020-09-01
  188. Canadian Solar, Jenner Solar Project, retrieved 2020-11-29
  189. "Jenner Solar Facility | Projects". BluEarth Renewables. Retrieved 2023-04-15.
  190. 1 2 Epcor, Kisikaw Pisim, retrieved 2020-09-07
  191. 1 2 Alberta, Government of. "kīsikāw pīsim Solar Farm (formerly E.L. Smith Solar Farm)". majorprojects.alberta.ca. Retrieved 2023-04-15.
  192. "Kneehill Solar Capstone Infrastructure". Retrieved 2021-07-05.
  193. "Michichi Solar Capstone Infrastructure". Retrieved 2021-07-05.
  194. AESO, Monarch Solar, retrieved 2022-04-18
  195. 1 2 Solar Krafte, Strathmore Solar Farm, retrieved 2020-09-07
  196. Suffield Solar GP Inc, Suffield Solar (PDF), retrieved 2020-09-01
  197. Solar Krafte Utilities, Prairie Sunlight III, retrieved 2020-09-01
  198. Omstead, Jordan (2020-11-19). "Indigenous-owned solar farm opens in remote northern Alberta community". CBC. Retrieved 2020-11-29.
  199. Greengate Power, Travers Solar, retrieved 2021-08-13
  200. BluEarth Renewables, Yellow Lake Solar Project, retrieved 2020-09-07
  201. DP Energy, Deerfoot Solar Park, retrieved 2020-09-07
  202. "New Asset Deerfoot (DFT1) Notice". AESO. Retrieved 2023-07-21.
  203. "New Asset Empress Solar Park (EMP1) Notice". AESO. Retrieved 2023-04-30.
  204. "New Asset Michichi Creek (MCH1) Notice". AESO. Retrieved 2023-04-15.
  205. DrumhellerMail.com, Pat Kolafa | © (2021-07-08). "Drumheller solar project changes hands". DrumhellerMail. Retrieved 2023-04-15.
  206. "New Asset Stavely (STV1) Notice". AESO. Retrieved 2023-04-30.
  207. "Fox Coulée Solar Project". Neoen. Retrieved 2022-12-23.
  208. 1 2 PACE Canada LP, Joffre Solar - 47 MW, retrieved 2020-11-29
  209. "New Asset Joffre Solar 1 (JFS1) Notice". AESO. Retrieved 2023-07-21.
  210. "New Asset Joffre Solar 2 (JFS2) Notice". AESO. Retrieved 2023-07-21.
  211. "Saddlebrook Solar and Storage Project". TC Energy. Retrieved 2021-07-27.
  212. "GL&P". GL&P. Retrieved 2023-12-03.
  213. Alberta, Government of. "Sollair Solar Energy Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  214. Solar Krafte, Spring Coulee Solar Project, retrieved 2020-09-07
  215. "BluEarth Renewables". Retrieved 2021-12-10.
  216. "Youngstown Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2021-03-30.
  217. "New Asset Youngstown Solar (YNG1) Notice". AESO. Retrieved 2023-07-21.
  218. Solar Krafte, Brooks Solar Farm, retrieved 2021-04-11
  219. Alberta, Government of. "Brooks Solar Farm". majorprojects.alberta.ca. Retrieved 2023-06-13.
  220. CBC Canada, Scottford Refinery Solar Farm, retrieved 2021-12-10
  221. Métis Nation of Alberta, Métis Crossing Solar Farm Project, retrieved 2022-12-23
  222. "CBC News Métis Crossing Solar Project".
  223. PACE Canada LP, Caroline Solar - 9 MW, retrieved 2020-11-29
  224. Alberta, Government of. "Caroline Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  225. Greengate, Jurassic Solar +, retrieved 2022-08-21
  226. "Tilley Solar Project". Alberta Major Projects. Government of Alberta. Retrieved 2022-12-23.
  227. Alberta, Government of. "Vulcan Community Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  228. Alberta, Government of. "Big Sky Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  229. "Big Sky Solar Project". bigskysolar.ca. Retrieved 2023-12-03.
  230. "Enterprise Solar Project". www.enterprise-solar.com. Retrieved 2021-12-10.
  231. "Enterprise Solar". Pattern Energy. Retrieved 2023-12-03.
  232. Georgetown Solar Project, retrieved 2022-12-23
  233. "Dunmore Solar Project". Dunmore Solar Project. Retrieved 2021-12-10.
  234. Alberta, Government of. "Dunmore Solar Project". majorprojects.alberta.ca. Retrieved 2023-12-03.
  235. Lathom Solar Project, Lathom Solar Project, retrieved 2021-05-12
  236. Voltarix Group, Moon Lake Solar Project, retrieved 2021-12-10
  237. Solar Krafte, Vauxhall Solar Farm, retrieved 2021-12-10
  238. EDF Renewable Energy, Vulcan Solar, retrieved 2020-09-07
  239. Voltarix Group, Rocktree Solar Project, retrieved 2021-12-10
  240. PACE Canada LP, Hanna Sheerness Solar - 13 MW, retrieved 2020-11-29
  241. Voltarix Group, Creekside Solar Project, retrieved 2021-12-10
  242. Elemental Energy, Foothills Solar Project, retrieved 2022-04-18
  243. "High River Solar". Elemental Energy. Retrieved 2022-08-21.
  244. Luna Solar+ Phase I, retrieved 2022-12-23
  245. "The Nova Solar Power Project | Nova solar - about the project". www.novasolarproject.com. Retrieved 2023-05-17.
  246. "Dolcy | Dolcy Solar Inc". Dolcy Solar. Retrieved 2023-09-19.
  247. DP Energy, Saamis Solar, retrieved 2022-08-21
  248. "Public gets look at Sylvan Lake solar power project - Red Deer Advocate". www.reddeeradvocate.com. 2023-08-18. Retrieved 2023-09-19.
  249. "Aira Solar Project Connection (2461)". AESO. Retrieved 2023-04-24.
  250. Luna Solar+ Phase II, retrieved 2022-12-23
  251. "Estuary Solar Project Connection (2418)". AESO. Retrieved 2023-05-17.
  252. "Home". Estuary Solar - Alberta. Retrieved 2023-05-17.
  253. EIA, World's-largest airport solar farm arriving at EIA, retrieved 2020-09-07
  254. Teric Power Ltd, eReserve1, retrieved 2020-11-29
  255. Teric Power Ltd, eReserve2, retrieved 2020-11-29
  256. Teric Power Ltd, eReserve3, retrieved 2020-11-29
  257. 1 2 "New Assets eReserve4 and eReserve6 (ERV4 and ERV6) Notice". AESO. Retrieved 2023-08-30.
  258. "New Asset eReserve5 Hughenden (ERV5) Notice". AESO. Retrieved 2023-02-09.
  259. "eReserve7 — Enfinite". Enfinite. Retrieved 2024-01-12.
  260. "eReserve8 — Enfinite". Enfinite. Retrieved 2024-01-12.
  261. "eReserve9 — Enfinite". Enfinite. Retrieved 2024-01-12.
  262. TransAlta, WindCharger Battery Storage, retrieved 2020-09-06
  263. TransAlta, WaterCharger Battery Storage, retrieved 2022-08-27
  264. Turning Point Generation, The Canyon Creek Project, retrieved 2020-11-29
  265. Masha Scheele, Canyon Creek Project eyes 2021 build, retrieved 2020-11-29
  266. "Management's Discussion and Analysis" (PDF). TransAlta. March 2019. p. 1. Retrieved 2020-02-06.
  267. "TransAlta Renewables Inc. Investor Presentation" (PDF). TransAlta Renewables. March 2018. pp. 19–22. Retrieved 2021-02-06.