Expressway S6 (in Polish droga ekspresowa S6) is a Polish highway which has been planned to run from the A6 autostrada near Szczecin, through Goleniów in West Pomerania to Gdańsk, parallel to the Baltic coast, forming the main connection between Gdańsk and Szczecin.
As of 2023, the sections from Szczecin to Koszalin and from Bożepole Wielkie to Gdańsk are open. However, a fragment of the Koszalin bypass has been delayed due to unexpected geological conditions and it is scheduled to open to traffic in early 2024.[1]
The remaining part from Koszalin to Bożepole Wielkie is under construction, with scheduled opening dates in 2025. This investment includes adding the second carriageway to the existing single-carriageway bypass of Słupsk. Upon completion of the ongoing contracts, A6/S6 will be open on its whole intended route from the German border to Gdańsk. Later, a new route of S6 will be constructed to form the western bypass of Szczecin, providing a parallel alternative to the existing route of A6 and S6 south-east of Szczecin.
History
After World War I, the German HaFraBa association had already set up plans to build an Autobahn along the route from Berlin through the Polish Corridor, to the Free City of Danzig and East Prussia (today informally known as Berlinka). The construction was pushed by the Nazi authorities after 1933 as an extraterritorial Reichsautobahn across the Polish Corridor of prewar Poland further south than the modern S6 freeway has been planned for, but the road was never completed.
The first section of S6 built was the Obwodnica Trójmiejska (Tricity Bypass) from Gdańsk to Gdynia, which is 38.6 km (24.0 mi) long, followed by the section between Szczecin and Goleniów, both in the 1970s. The next part of S6 to be opened was 16.3 km (10.1 mi) bypass of Słupsk that was completed in October 2010.[2] The bypass of Nowogard was completed in December 2011, with the rest of the section between Szczecin and Koszalin open by 2019.
In July 2010, the route between Goleniów and Słupsk was finalised. It will be about 180 km (110 mi) long and pass just south of Kołobrzeg and then north of Koszalin.[3] The road will be a dual carriageway, with 27 interchanges and 130 viaducts, with about 20% of it overlapping the current route of National Road 6 (DK6).[3] Doubts about financing made construction not expected to start before 2020,[4] but the schedule was later accelerated. The tenders for design-build contracts on the section between Goleniów and Koszalin were announced in August 2014, with expected completion around 2018.
Sections of the expressway
Expressway section | Length | Constructed | Note |
---|---|---|---|
Szczecin Kołbaskowo - Goleniów Północ | ~20 km | Proposed western bypass of Szczecin, under research. Kołbaskowo interchange tendered. | |
Szczecin Tczewska - Goleniów Północ | 24.6 km | 1976-1979 | overlaps with S3 on this section, tender for its reconstruction in progress - will be incorporated into A6 motorway. |
Goleniów Północ- Nowogard Zachód | 19.2 km | 2015–2019 | Opened April 2019 |
Nowogard Zachód - Nowogard Wschód | 9.4 km | 2010–2011 | opened December 2011 |
Nowogard Wschód- Płoty | 20 km | 2015–2019 | Opened November 2019 |
Płoty- Kiełpino | 14.6 km | ||
Kiełpino - Kołobrzeg Zachód | 24 km | ||
Kolobrzeg Zachód- Ustronie Morskie | 14.7 km | ||
Ustronie Morskie - Koszalin | 24.2 km | ||
Koszalin - Słupsk | 66.1 km | – | Tendered |
Słupsk bypass | 16.3 km | 2008–2010 | opened October 2010. Built as single carriageway with space to add a second one in the future, second carriageway tendered. |
Słupsk- Gdynia | 105.5 km | 2019 - ongoing | Słupsk - Lębork section tendered, Lębork - Gdynia section under construction. |
Tricity Bypass II(near Żukowo) | 32.7 km | Tendered | |
Tricity Bypass | 38.6 km | 1973–2008 | built in stages starting in 1973 |