Line 3 | |
---|---|
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 45.272 km[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Since 23 December 2023, with through train to/from line 11, Gexiangjie and Weiting stations are only serving trains of line 11.
Stations
Service routes | Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|---|
L3 | L11
local |
L11
rapid |
English | Chinese | ||||
● | Suzhou Xinqu Railway Station | 苏州新区火车站 | 6 ITH Tram line 2 | 0.00 | 0.00 | Huqiu | ||
● | Huichanglu | 惠昌路 | ||||||
● | Wenchanglu | 文昌路 | Tram line 2 (branch) | |||||
● | Changting | 长亭 | ||||||
● | Tongdun | 铜墩 | ||||||
● | Mayunlu | 马运路 | ||||||
● | Xijinqiao | 西津桥 | 8 | |||||
● | Heshan | 何山 | ||||||
● | Shizishan | 狮子山 | 1 Tram line 1 | |||||
● | Shishanlu | 狮山路 | ||||||
● | Shajinqiao | 沙金桥 | ||||||
● | Suoshanqiao West | 索山桥西 | 5 | |||||
● | Hengshan | 横山 | ||||||
● | Hengtang | 横塘 | ||||||
● | Shihu North | 石湖北 | ||||||
● | Xinguo | 新郭 | Gusu | |||||
● | Panlilu | 盘蠡路 | 2 | Wuzhong | ||||
● | Baodailu | 宝带路 | 4 | |||||
● | Yingchunlu | 迎春路 | ||||||
● | Beiganglu | 北港路 | SIP | |||||
● | Tongyuanlu South | 通园路南 | 7 | |||||
● | Shupulu North | 墅浦路北 | ||||||
● | Dongzhenlu | 东振路 | ||||||
● | ● | ● | Jinsheqiao | 金厍桥 | 5 | |||
● | ● | | | Ligongdi West | 李公堤西 | 6 | |||
● | ● | | | Dongfangzhimen | 东方之门 | 1 | |||
● | ● | | | Yanyuqiao | 烟雨桥 | ||||
● | ● | | | Nibang | 泥浜 | ||||
● | ● | | | Tangzhuang | 唐庄 | 8 | |||
● | ● | | | Kuatang | 跨塘 | ||||
● | ● | | | Suzhou Yuanqu Railway Station | 苏州园区火车站 | 8 KAH | |||
● | ● | | | Fangwanjie | 方湾街 | ||||
● | ● | | | Fenghelu | 丰和路 | ||||
● | ● | | | Shuangmajie | 双马街 | ||||
● | ● | | | Fengtingdadao | 葑亭大道 | 5 | |||
● | | | Gexiangjie | 戈巷街 | |||||
● | ● | Weiting | 唯亭 | 11 | ||||
↓ | Through service to/from Huaqiao on 11 | |||||||
Through service
Through service between Line 3 and Line 11 started on December 23, 2023.[4]
Map
Gallery
- An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
- An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References
- 1 2 "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- 1 2 "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- ↑ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- ↑ "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.